Electric Bike
Home of Electric Bike Factory
We have power kits for every bike and Trike
See our units in use
Need Help Installing?
Distributors and Dealers are Walcome
Contact the office of Electric Bike Factory
Power your bike or Trike
Made in the U.S.A.
GoGreen Product

Electronic Connections
Battery connection is the last wiring connection you make

1. Switch Connect the end of the switch wire to the board where it says SW- and SW+. There is no positive or negative so it makes no difference which ends you connect to the board. This completes the switch circuit.

2. Motor Connect black wire into MOT- on the board and the red wire into MOT+ on the board. This completes the motor circuit.

3. Charger wires must be connected to the battery terminals. Do not use the charger connections on the electronic board. The red and black trailer plug-in connector remains outside the bag for quick recharge.

4. Battery wires are pre-connected to the board. Just connect “O” ring to battery terminals, red (+) positive & black (-) negative wire to matching battery post. This completes battery connection. If you have to go into the battery bag. The first thing you must do is disconnect the black battery wire before you do anything. This makes the board inactive. Then you will be able to do what you have to without shorting out the board, reconnect black wire when done.

5. Use very little tension on the motor bungee cords. It needs only 2 lb. pressure so the wheel will not slip.

6. PLEASE NOTE: The bicycle must be pedaled before the switch will start the motor. This is a safety feature.

7. Always wear a helmet and observe traffic laws & safe bike riding procedures.

 

 
Home | Bike Power Kits | Showroom | EZ Installation | Distributors | Contact Us | Top of Page
Site Design and Support by: Florida Web Service Inc.

  Electric Bike